Episode Player

Kingman Road Maintenance Scheduled

SignalsAZ.com - Arizona News Podcast

SignalsAZ.com - Arizona News Podcast
Kingman Road Maintenance Scheduled
Feb 27, 2026

Send us a text and chime in!

The City of Kingman will begin crack sealing operations on Monday, March 2, 2026, along Hualapai Mountain Road from Central Street to the Kingman city limits as part of its ongoing Pavement Preservation Program. Work is anticipated to continue throughout the week, with crews operating daily from 7:00 a.m. to 4:00 p.m. Motorists should expect lane closures and detours between Seneca Street and Central Street during this time. Traffic control measures will be in place to help guide drivers safely through the work zone. Crack sealing is a proactive maintenance strategy designed to prevent water from penetrating the roadway surface,...

 

For the written story, read here >> https://www.signalsaz.com/articles/kingman-road-maintenance-scheduled/

Check out the CAST11.com Website at: https://CAST11.com 
Follow the CAST11 Podcast Network on Facebook at: https://Facebook.com/CAST11AZ
Follow Cast11 Instagram at:
https://www.instagram.com/cast11_podcast_network