Episode Player
Flagstaff Project Aims to Reduce Flood Risk
SignalsAZ.com - Arizona News Podcast
Starting in early-April, the City of Flagstaff (City) and their contractor Eagle Mountain Construction will begin channel improvements within a section of Fanning Wash, between Steves Boulevard and Linda Vista Drive (as shown in the map). This work includes the removal of vegetation and trees as needed, as well as slope and channel enhancements to improve channel capacity for this section of the Fanning Wash. This project is part of the “5-year Stormwater Capital Improvements Program” and is scheduled to be complete in summer 2026. This project is the first of three planned improvements in Fanning Wash that, once complete,...
For the written story, read here >> https://www.signalsaz.com/articles/flagstaff-project-aims-to-reduce-flood-risk/
Check out the CAST11.com Website at: https://CAST11.com
Follow the CAST11 Podcast Network on Facebook at: https://Facebook.com/CAST11AZ
Follow Cast11 Instagram at: https://www.instagram.com/cast11_podcast_network