Episode Player

Lane Restrictions Planned on SR 89A Switchbacks

SignalsAZ.com - Arizona News Podcast

SignalsAZ.com - Arizona News Podcast
Lane Restrictions Planned on SR 89A Switchbacks
Mar 30, 2026

Send us a text and chime in!

A guardrail replacement project along the State Route 89A switchbacks at the north end of Oak Creek Canyon is scheduled to begin Wednesday, April 1, according to the Arizona Department of Transportation. SR 89A is scheduled to be narrowed to one lane at times along the 3-mile stretch (mileposts 387-390) between Pine Flat Campground and the Oak Creek Vista scenic overlook. Work typically will take place from 6 a.m. to 6 p.m. Monday through Thursday and from 6 a.m. to noon on Friday. Flag crews and a pilot car will guide traffic through the work zone. A 12-foot vehicle width...

 

For the written story, read here >> https://www.signalsaz.com/articles/lane-restrictions-planned-on-sr-89a-switchbacks/

Check out the CAST11.com Website at: https://CAST11.com 
Follow the CAST11 Podcast Network on Facebook at: https://Facebook.com/CAST11AZ
Follow Cast11 Instagram at:
https://www.instagram.com/cast11_podcast_network