Own The Build

When It’s Time to Walk Away: How to Terminate a Contract Without Blowing Everything Up (EP 226)

C-Link Episode 226

In the first instalment of our 4-part Contract Clarity Series with Sarah Fox — contract strategist, speaker, and author of Small Works Contracts in Just 500 WordsPaul dives into one of the trickiest, most nerve-racking topics in construction: contract termination.

Termination often strikes fear into contractors and lawyers alike — but it doesn’t have to. In this episode, Sarah and Paul explore why termination needs to be seen less like a courtroom drama and more like a planned, mutual exit when things aren’t working.

We cover:

  • What termination for cause, for convenience, and at-will really mean
  • Common traps and how to avoid a Multiplex v Cleveland Bridge-style disaster
  • What rights you have even if your contract is silent on termination
  • Why “termination at convenience” clauses are a red flag for subcontractors
  • How to build fairness into your contracts and avoid company-ending mistakes

If you’ve ever issued (or received) a 7-day notice, considered walking off site, or been hit by a termination clause you didn’t see coming — this episode is essential listening.

📩 If you'd like to read the two Own the Build eBooks based on 200+ episodes — Mastering Your Career in Quantity Surveying and The AI Revolution in Quantity Surveying — head to the show notes to download your free copy.

Download them here - Free eBook Downloads.

Send us a text


Want to connect with Paul?

Paul is on Linkedin here and would love to talk. You can also connect with Paul at paul@c-link.com or through, C-Link.

Watch the Video to learn more; you can book a demo by clicking here.

C-Link is software built by Quantity Surveyors for Main Contractors. We save 600 hours of Quantity Surveying time per project in automation. We can make your QS’ so much more efficient.


People on this episode