PG&E defines a new utility model for data centers, onsite gas, and community connection

Factor This

Use Left/Right to seek, Home/End to jump to start or end. Hold shift to jump forward or backward.

0:00 | 39:42

Tell us what you think of the show!

The scale of energy demand in Northern California has reached a historic inflection point. With a 10 GW pipeline of data center demand—enough load to power more than 7.5 million homes—utility planners at Pacific Gas and Electric (PG&E) are navigating a high-stakes race against time, infrastructure limits, and the laws of physics.

To better understand how PG&E is turning these challenges into opportunities, we connected with two people who are doing exactly that for the company every single day. Austin Hastings is Vice President, Gas Engineering at PG&E while Mike Medeiros is Vice President, Strategic Commercial Solutions at PG&E.