Episode Player
Episode 5 - Change Orders
The Operations Hub
The Operations Hub
Episode 5 - Change Orders
Oct 09, 2024
SMACNA
For the latest episode of the Operations Hub, Seth Lennon is joined by Ashley Duncan (General Sheet Metal) and Joe Samia (General Consolidated) for an in-depth discussion on the impact of change orders. The panel outlines some of the challenges posed by changes that occur during a project and some of the best practices that can be utilized when something unexpected occurs.