The Operations Hub
A forum where SMACNA Contractors can learn from one another on ways they can enhance their businesses through the incorporation of best practices and new technologies.
The Operations Hub
Episode 5 - Change Orders
•
SMACNA
Use Left/Right to seek, Home/End to jump to start or end. Hold shift to jump forward or backward.
For the latest episode of the Operations Hub, Seth Lennon is joined by Ashley Duncan (General Sheet Metal) and Joe Samia (General Consolidated) for an in-depth discussion on the impact of change orders. The panel outlines some of the challenges posed by changes that occur during a project and some of the best practices that can be utilized when something unexpected occurs.