The Operations Hub
A forum where SMACNA Contractors can learn from one another on ways they can enhance their businesses through the incorporation of best practices and new technologies.
The Operations Hub
Episode 5 - Change Orders
•
SMACNA
For the latest episode of the Operations Hub, Seth Lennon is joined by Ashley Duncan (General Sheet Metal) and Joe Samia (General Consolidated) for an in-depth discussion on the impact of change orders. The panel outlines some of the challenges posed by changes that occur during a project and some of the best practices that can be utilized when something unexpected occurs.