PLMA: Load Management Dialogues

Battery Recycling in Belgium aired 2020-06-18

June 18, 2020 PLMA Season 2 Episode 10
PLMA: Load Management Dialogues
Battery Recycling in Belgium aired 2020-06-18
Show Notes

Gain key insights from a 17th PLMA Award-winning initiative for Technology Pioneer.

Connected Energy (UK) Ltd.’s system installed at the Umicore industrial site in Belgium reuses Renault Kangoo batteries which previously powered 48 vehicles in France. The system provides a frequency response service to Elia, the Belgium system operator, to help it balance electricity supply and demand for network stability. It is the first time 'second-life’ batteries have been used at an industrial scale in this way in the country. The batteries have a combined energy storage capacity of 720 kWh and can deliver 1.2 MW in power. With solution project partner ENGIE, the battery is optimised in real-time as part of a synchronized asset stack providing revenue generation and power quality management for global materials technology and recycling group Umicore who also recycle EV batteries. The installation will give the company insight into the process of wear in the batteries, which can help to build better batteries.

Participants:

  • Mark Bailey, Connected Energy (UK)
  • Michael Smith, National Grid

Length: 32:14